Skip to content
Home » medical alert systems

medical alert systems

Crucial Emergency Equipment Maintenance

As part of your workplace emergency response plan, you should have a first aid plan. These are documented first aid response protocols that guide staff and others on site on what actions should be taken in the event of a first aid emergency.

Arrangements will vary across each workplace based on staffing, the work environment, and element of risk, however the first aid response will generally include commonly understood first aid action steps including:

  • How to trigger a nurse call alert
  • How to respond to a nurse call alert
  • How to monitor and manage hardware and software that’s used as part of an emergency response
  • How to monitor and manage first aid equipment
First Aid Obligations For Workplaces

First Aid Obligations For Workplaces

The average person will spend approximately 90,000 hours, or one third of their life, at work. Businesses are required to ensure (under the WHS Act) that workers and other persons are not exposed to health and safety risks arising from the business or undertaking. Specific obligations includes:

  • Provision of emergency equipment such as nurse call systems, defibrillators, first aid kits, and emergency alert communication devices (evacuation sirens)
  • Ease of access to these facilities;  for example they can’t be in a locked room or limited security space within the building
  • An adequate number of workers trained to administer first aid at the workplace or that workers have access to an adequate number of other people who have been trained to administer first aid

Management have a duty to exercise due diligence to ensure that the business is complying with regulations. Workers have a duty to take reasonable care for their own health and safety and must not
adversely affect the health and safety of other persons. Everyone on site must comply with any
reasonable instruction and cooperate with any reasonable policy or procedure relating to
health and safety at the workplace, such as procedures for first aid and for reporting injuries
and illnesses.

Construction Nurse Call System

Construction Nurse Call System Selection Criteria

Construction is a high risk industry, where workers brave unpredictable weather conditions, work at great heights, and handle dangerous tools and machinery. They navigate constantly changing building sites, adapting to new layouts whether they’re permanently on the project, or employed as a contractor or sub-contractor.

In the event of a nurse call emergency on a construction site, it is crucial to have a straightforward and dependable method to alert others, establish clear communication channels with important event information, and coordinate a swift response.

false alarm

Preventing False Evacuation and Nurse Call Alarms

When installing smoke alarms, evacuation systems, or nurse call systems at your workplace there is always the potential for false alarms. These erroneous reports of emergencies can lead to unnecessary panic and the misallocation of resources, such as emergency response personnel and carers, to places where they are not needed.

False alarms pose a significant risk, as they can divert emergency responders away from genuine emergencies, with the worst outcome a loss of life. Repeated false alarms in a specific area can also lead worker to develop alarm fatigue, causing them to disregard an alarm, assuming it’s false.

When considering an emergency alert system, it’s crucial to consider how that system addresses false alarm prevention as part of your purchasing decision. Neglecting this can have costly consequences for you and your business.

Integrations With HammerTech, Procore, & Irongate Solutions

Integrations That Improve Your Customer Experience

Integrations With HammerTech, Procore, & Irongate Solutions

Many of our customers sit within the construction, civil works, and refurbishment industries. Historically low tech, innovative businesses are now looking at products and services that can assist them to digitise practices and processes that help them improve worker safety, project management, and operations.

World First Cellular Unit

Protecting Workers With World First Cellular Units

As buildings around the country age, and prime real estate becomes less available, refurbishment projects are becoming increasingly common. However, these projects are more challenging than new construction projects because they require operators to accommodate existing structures, often with confined spaces and limited access. This can pose a greater safety risk for workers who must work in an environment initially constructed to adhere to different building regulations.

Retrofitting

The Best Way To Approach Retrofitting

Approaching Retrofitting The Right Way

When we’re engaged to quote on a system, often it’s for a customer who wishes to install within an existing structure. Given Orisent systems utilise a mesh RF and/or cellular connection, our systems don’t need to be hard wired into a building, particularly if the devices will be battery powered. Thus retrofitting our systems require little to no additional investment.