Case Study: Data Centre Construction
Reliable nurse call and evacuation coverage delivered throughout a data centre build, where wireless uninterrupted performance is the critical requirement.
Project Brief
Design and installation of a combined nurse call and evacuation system for a data centre construction project, where maintaining wireless reliability throughout a structurally complex environment was essential.
Solution
Orisent deployed combined wireless nurse call triggers and evacuation sirens throughout corridors and stairwells, ensuring reliable coverage across tight spaces, concrete cores, and evolving floor layouts. Real-time telemetry through the Orisent platform gave the team continuous network visibility as the construction site evolved, enabling proactive coverage management throughout the build.


Multi-Storey Refurbishment

A reconfigurable wireless nurse call system that relocated with work teams across an occupied office building in the CBD.
Power Station Decommissioning

Safe, coordinated remediation and conservation work across a heritage-listed site with complex access constraints.