Case Study: Australia’s Largest Cultural Infrastructure Project
Specified for the $1.7B Melbourne Arts Precinct Transformation, where a constantly evolving 30,000 sqm site demanded a wireless emergency system that could scale and adapt in real time.
Project Brief
A highly complex project involving a new 30,000 sqm gallery, major structural upgrades, and live operational environments required wireless emergency coverage that could keep pace with daily layout changes and expanding site boundaries.
Solution
Orisent’s wireless system was deployed across the constantly evolving site, with combined nurse call triggers and evacuation sirens scaled progressively as the project expanded. Safety teams had real-time visibility of system performance through the Orisent platform on and off site, saving time using telemetry insights and proactive alerts delivered via the smartphone app and user portal.


Hospital Expansion Project

Wireless nurse call and evacuation system engineered for the complexities of construction in a working hospital environment.
Overwater Construction

A flexible wireless system that moved with the site, covering challenging construction environments such as moving barges.